We are your...


Badger MedicalBadger Medical, located in Verona, WI, added on an addition to their existing facility. They called on Loopers, LLC and Myers Heating & Cooling to assist them with installing 108 300-feet-deep vertical geothermal loop fields, and connecting the geothermal system to their new addition. |
![]() |
![]() |
Beloit Transfer and Transit BuildingBeloit Transfer and Transit, located in Beloit, WI, constructed a new building for their business. In developing their building, they knew they wanted to incorporate a geothermal heat pump system. So they contacted Loopers, LLC to install 120 150-feet-deep geothermal vertical loop fields. |
![]() |
Beloit Geothermal VaultBeloit Geothermal Vault, located in Beloit, WI. This is an example of how larger commercial projects connect the geothermal loop field to the building's mechanical system. These are used primarily when the system size requires from 20 ton - 1,000 tons of geothermal energy. |
![]() |
Columbus Dental ClinicColumbus Dental Clinic, located in Columbus, WI, built a new structure for their dental clinic. They called on Loopers, LLC and Myers Heating & Cooling to assist them with installing a geothermal heat pump system. The system consisted of a 40-ton system utilizing 48 100-feet-deep geothermal vertical loop fields. Because of the geological make-up of the earth where they were building, the geothermal system's vertical depths and the quantity of loop fields were adjusted to properly operate the mechanicals required. |
![]() |
St. Paul's ComplexSt. Paul's Complex is an assisted living facility located in Grafton, WI. They called on Loopers, LLC and Myers Heating & Cooling to design and install a 60-ton geothermal heat pump system with a horizontal geothermal loop field. Loopers utilized a horizontal slinky application for the project. The new 60-ton geothermal loop field lies 8-feet below the complex's baseball diamond. After the installation, the baseball field was restored back to its original condition. |
![]() ![]() |
![]() |